Power and lighting system for the whole building.
Light pole installation method statement.
Base for 25 35 pole is 680 kg.
Deliver components parts to site completely identified in accordance with shop and certified drawings prepared for this work.
Ensure all finishing works in all related areas are completed for the area of installation and released cleared by civil section to proceed on with the installation of lighting fixtures.
This method statement is to define the method to be used to ensure that the street light fittings are dismantled and installed correctly and acceptable and shall conform to the contract documents and specification.
Led street light pole installation procedure there are 6 in stallation procedures of led street lamp pole for your reference.
5 once the pole is lowered into place resting on the dumpy levelling nuts maintain the strain on the pole and using one of the spanners adjust the dumpy.
Firstly we contact with the departments of the pipeline to understand the approximate distribution of underground cables and knowing the detailed division of underground pipelines through excavation channels.
Material used will be as approved by the engineer the sizes and routes routing will be as per the approved shop drawing.
If installation required heavy vehicles extreme care has to be taken for preventing damages of.
This information cannot be comprehensive enough to cover all situations or the details of all structures.
Dismantle existing pole lantern and feeder pillar.
By manual method prior to lowering the pole have one of the installation crew rotate the pole to match the position of the bolts and gently lower the pole maintaining alignment.
All installations are to be carried out under strict supervision of qualified supervisors and engineers.
This guide covers the installation of light poles.
With the pole axis as any eccentric loading may result in a misaligned joint and or may damage the pole sections due to the additional bending stresses.
This method statement will define the following works.
Set up to be symmetrical about the pole axis to.
Anchor bolts are the most commonly used method to secure poles to concrete foundations.
Installation methods of external exterior and outdoor lighting system includes lighting equipment luminaires control gears panel boards poles brackets cabling and allied minor civil works.
Installation guidelines 091015 1 installation guidelines for sports high mast lighting structures the following information is intended as a guide for the installing contractor.
The contractor shall only use equipment rated for such weight.
Pole assembly installation for street light poles figure 1.
A particular set up is shown in figure 1.