Most macerating toilets are installed in places where a standard toilet cannot.
Macerating toilet in floor install.
To have a toilet in a basement a macerating toilet can be used.
Unlike a gravity toilet which empties into a 3 or 4 inch hole in the floor an upflush toilet empties out the rear into a holding tank that contains a macerator and a pump.
This kind of toilet connects to a macerator unit behind it which pumps waste through a 3 4 inch 1 9 cm discharge pipe after grinding it up with stainless steel blades.
That is they do not have to be placed over a conventional roughed in drain line there is no one available that is why you are installing this type of toilet.
The toilet bowl and toilet tank combination on a macerating toilet install the same way that a conventional toilet does except for one big exception.
To install the toilet set the clamp onto the toilet s discharge outlet image 1.
Tap into or establish a fresh water supply to the installation area and position the supply line valve 10 to 12 inches off the floor.
This means that the waste may have to travel a ways down the pipe lines to reach the main house drain.
Next place the bowl in front of the macerating unit and pull the accordion gasket all the way onto the discharge outlet image 2.
That being said even small installation errors can lead to bigger problems down the road something you definitely do not want to deal with as it typically involves a slurry of raw sewage.
Silent venus installation silent venus s installation process comes without the mess and expense of breaking concrete floors.
This old house plumbing and heating expert richard trethewey shows how to outfit a bathroom that s at basement level.
A macerating toilet is useful if a bathroom will be well below the sewer line as much as 12 feet or if pipes must travel a long distance up to 150 feet before connecting with the main sewer line.
A macerating toilet has a rotating blade that grinds waste before pumping it away.
Installing a macerating toilet is fairly straightforward and can usually be completed within half a day by a highly experienced diyer.
Use cold water for toilet installations.
There is also no need to instal.
When installing against an outside wall leave a few inches behind the macerator pump for insulation.